Return to Index
problem-solving January 10, 2026

The Ultimate Checklist for Migrating from Ayrshare or Upload-Post to Mallary.ai

Migrating your social publishing workflow from platforms like Ayrshare or Upload-Post to Mallary.ai can feel daunting. Differences in APIs, authentication flows, media handling, scheduling semantics, and webhook behavior create real friction. This guide gives you a practical, step-by-step checklist to migrate safely and efficiently—minimizing downtime and preserving post history, scheduled campaigns, and analytics continuity.

Why Teams Migrate (and the Common Pain Points)

Understanding the motivation behind migration helps shape the checklist. Typical reasons teams move from Ayrshare or Upload-Post to Mallary.ai include: faster API responses, unified endpoint design, better media storage, richer analytics, or dedicated migration support. But several challenges often cause migration projects to stall:

  • Incompatible authentication/token models
  • Different media hosting or URL requirements
  • Conflicting scheduling semantics and time zones
  • Missing historical post data or analytics continuity
  • Webhook payload and retry behavior discrepancies

Pre-Migration Audit: Know What You Have

Inventory everything

Start with a full audit of the systems and integrations that rely on Ayrshare or Upload-Post.

  • List connected social accounts and their permission scopes.
  • Catalog scheduled posts, campaigns, and recurring content.
  • Record custom fields, metadata, and tags used for segmentation.
  • Note dependent services (analytics, CRM, CMS) and webhook consumers.

Export and backup

Always export data before making changes. This includes post history, media assets, analytics reports, and webhook logs.

  1. Export CSV/JSON of scheduled posts and published history.
  2. Download media assets or ensure they are accessible via stable URLs.
  3. Save webhook event logs to verify post-migration replay behavior.

The Migration Checklist (Step-by-Step)

Use this step-by-step checklist as your migration playbook. Treat each step as a gate—with testing and sign-off—before moving to production.

  1. Map features and endpoints

    Compare Ayrshare/Upload-Post endpoints with Mallary.ai equivalents. Create a mapping document that translates API calls, parameters, and error codes.

  2. Plan authentication/token exchange

    Identify how tokens are generated, renewed, and stored. Prepare a token migration or reauthorization strategy for OAuth, API keys, or account-level credentials.

  3. Handle media migration

    Decide whether to transfer media files into Mallary.ai or continue using existing CDN URLs. Make sure Mallary.ai’s media requirements (format, max size, aspect ratio) match your assets.

  4. Migrate scheduled posts carefully

    Recreate scheduled posts in Mallary.ai with attention to time zones, recurrence patterns, and delivery windows. Run a small subset live to validate behavior.

  5. Recreate webhooks and integrations

    Re-register webhook endpoints, map event payloads, and confirm retry logic. Update downstream services to parse Mallary.ai payloads if they differ.

  6. Implement rate limit and error handling

    Adjust client-side throttling to match Mallary.ai limits. Implement exponential backoff, idempotency keys, and robust retry strategies.

  7. Test end-to-end in staging

    Run publish, edit, delete, and webhook flows in a staging environment. Use production-like data and simulate errors to confirm resilience.

  8. Plan rollback and cutover

    Have a rollback plan in case the migration reveals unexpected issues. Consider a phased cutover (per-brand, per-platform, or per-region).

  9. Monitor and validate post-migration

    After cutover, monitor delivery rates, engagement metrics, and webhook events closely for the first 72 hours and beyond.

Key Technical Areas to Watch

Authentication and tokens

  • Confirm Mallary.ai token expiry, refresh flows, and scopes.
  • Securely store and rotate credentials. Use vaulted secrets for production.

Media and asset URLs

  • Check that media URLs are accessible to destination social platforms (public vs. signed URLs).
  • Validate transforms (thumbnails, cropping) required by each channel.

Scheduling semantics

  • Normalize time zone handling. Mallary.ai supports explicit time zones—use them to avoid surprises.
  • Verify recurrence rules (RRULEs) and daylight saving changes.

Testing and Quality Assurance

Thorough testing prevents costly mistakes. Create scenarios and acceptance criteria for each feature you depend on:

  • Publish validation: confirm posts appear correctly on target networks (copy, links, media).
  • Error injection: force failed uploads and network errors to verify retries and alerts.
  • Webhook replay: ensure your systems can replay and reprocess events from Mallary.ai.
  • Analytics continuity: compare key metrics before and after migration to detect gaps.

Tip: Use a staging account that mirrors production permissions to avoid surprises with platform rate limits or permission rejections.

How Mallary.ai Makes Migration Easier

Mallary.ai is built with migrations in mind. Here’s how it helps solve the common challenges you’ll face when moving from Ayrshare or Upload-Post:

  • Unified API — Simplified endpoints reduce the number of mappings you need to maintain.
  • Migration guides and templates — Ready-made scripts and mapping docs speed up data transfer and reduce manual work.
  • Robust media handling — Flexible options to host media within Mallary.ai or reference external URLs while preserving formats required by social networks.
  • Webhook compatibility tools — Payload mappers and replay utilities let you adapt Mallary.ai events to your existing consumers without big code changes.
  • Expert support — Migration support from product engineers helps navigate edge cases like historical analytics imports or complex scheduling rules.

Common Pitfalls and How to Avoid Them

  • Underestimating media prep: Large bulk media transfers can hit bandwidth or storage limits. Plan phased uploads and compress where appropriate.
  • Ignoring time zones: Always test scheduled posts across client and server time zones to avoid accidental double-posting or missed windows.
  • Skipping webhook tests: Webhooks are often different between platforms—don’t assume parity. Test real webhook flows thoroughly.
  • No rollback plan: Have clear criteria to roll back to Ayrshare or Upload-Post if critical issues arise.

Post-Migration: Monitor, Train, and Iterate

After the migration is complete, focus on stabilization and adoption:

  • Monitor performance dashboards for throughput, error rates, and delivery success.
  • Train your team on Mallary.ai workflows and new features—short how-to sessions reduce support tickets.
  • Collect feedback and iterate: small tuning cycles for scheduling windows, media transforms, and webhook handlers will pay off quickly.

Conclusion

Migrating from Ayrshare or Upload-Post to Mallary.ai doesn’t have to be risky. With a clear inventory, a detailed mapping document, staged testing, and a rollback plan, you can move safely and take advantage of Mallary.ai’s unified API, improved media handling, and migration support. Use this checklist as a practical project plan: audit, map, migrate, test, and monitor.

Ready to simplify your social publishing and start your migration with confidence? Sign up for free today and get access to Mallary.ai’s migration resources and expert support to guide you every step of the way.